Cavalier Lily's Diary



昨日までのアクセス
TOP
Japanese
   
09/12/31 Japanese food in our home
09/12/29 House Construction - Compilation
09/12/24 Christmas Party
09/12/21 Christmas presents
09/12/18 Country Mall
09/12/14 To Cebu Island
09/12/13 Peaceful days
09/12/05 Christmas illuminations at Depolog
09/11/30 Evening race
09/11/25 Evening walk
09/11/19 Introducing my home
09/11/13 Tuna sashimi
09/11/11 Studying arithmetic
09/11/10 evening
09/11/08 big family
09/11/06 Kappa Ebisen
09/11/02 Farmland and corn
09/11/01 Weight measurement
09/10/29 Tigdok Animal Zoo
09/10/28 On Dad's pillow
09/10/23 Feature: Women of Cebu
09/10/23 Rabies vaccination in Cebu
09/10/15 Car air conditioning repair
09/10/13 Typhoon damage in Manila
09/10/11 Watching a movie
09/10/03 The state of farmland
09/10/02 hospitalization
09/09/25 Birthday party
09/09/21 Urethral stones again
09/09/21 Drying rice
09/09/20 Jump rope in the evening
09/09/19 Rice harvest
09/09/15 Lily is fast charging.
09/09/11 Jian Jinny is an excellent student.
09/09/09 The dancing girls
09/09/08 Going to farmland
09/09/07 A walk
09/09/06 Relaxing on the terrace
09/09/03 A beaming smile
09/08/29 terrace
09/08/23 Roroy-chan Jump
09/08/22 Visiting farmland
09/08/17 Terin's birthday
09/08/16 Roroy-chan
09/08/10 Staying home alone
09/08/09 NHK WORLD Shortwave Broadcasting
09/08/08 stroll
09/08/06 Amateur radio tower
09/08/05 To Gigi Hospital
09/08/04 Elementary school event
09/08/02 It's cold in the Philippines too...
09/07/31 Roroy-chan
09/07/25 Lily's dad's friend
09/07/19 Model
09/07/19 Amateur radio 144MHz antenna
09/07/18 Construction of a pigsty on farmland
09/07/17 A walk in the afternoon
09/07/17 Morning scenery
09/07/16 Morning walk
09/07/10 Amateur radio 50MHz antenna
09/07/13 Sleeping peacefully together
09/07/12 Dog Festival
09/07/09 Houses and pigsties on farmland
09/07/09 Study room
09/07/08 PRIUS
09/07/07 They caught a shoplifter.
09/07/07 A walk
09/07/07 kindergarten
09/07/04 Japanese cuisine
09/07/03 I love you
09/07/02 CQ CQ CQ!
09/07/02 Farmland and work sheds
09/07/02 table
09/07/01 My pride and joy: the bath
09/06/30 Carabao
09/06/25 Third hospitalization
09/06/21 I'm down with diarrhea.
09/06/15 Land development
09/06/15 New family and outlet
09/06/14 Farmland maintenance and picnics
09/06/14 Land development
09/06/13 5th Family Anniversary
09/06/11 Lily and Loroy
09/06/10 House construction and completion
09/06/08 House construction and completion party
09/06/05 Truck breaks down
09/05/31 Beautiful Queen
09/05/30 Searching for farmland
09/05/29 Amateur radio antenna
09/05/28 Playing together
09/05/28 House construction/room conditions
09/05/27 global warming
09/05/26 beach
09/05/24 The distance between Lily and Loroy
09/05/17 Roroy-chan
09/05/15 A delicate distance
09/05/13 First meeting
09/05/10 Roroy-chan
09/05/08 Hello, my name is Roroy.
09/05/07 I'm going to Cebu Island.
09/05/05 I bought a truck for business purposes.
09/05/01 House construction/room conditions
09/04/29 5th birthday
09/04/22 They are cherished.
09/04/20 Building a house and another hospital stay.
09/04/17 Rice harvest
09/04/15 The rice harvest will be here soon.
09/04/14 The roof for the house has arrived.
09/04/13 bicycle
09/04/11 run
09/04/11 Lunch with the kids
09/04/08 House construction and parking
09/04/07 Running after a long time
09/04/02 Summer vacation
09/03/27 I have a little free time
09/03/24 Gentle and heartwarming
09/03/22 rice paddy
09/03/20 Special day
09/03/18 Shopping by sidecar
09/03/18 House construction - window frames
09/03/15 A peaceful morning
09/03/11 House building - Lily also visits
09/03/09 House construction/room conditions
09/03/08 pool
09/03/07 House construction - shower room
09/03/07 Morning walk on the beach
09/03/05 House construction and electrical work
09/03/04 Riding in a sidecar
09/03/02 Going to Cagayan
09/02/28 Street corner scenery
09/02/28 House construction - Top view
09/02/27 Elementary school event
09/02/25 House construction - roof and ceiling
09/02/25 I'm feeling better now.
09/02/24 House construction and roof framing
09/02/24 House building and farmland search
09/02/23 Lily has fully recovered.
09/02/23 House construction - roof framework
09/02/20 Something is wrong with Lily's eyes.
09/02/19 House construction and water/sewage systems
09/02/18 Lily's dad is hospitalized.
09/02/15 drive
09/02/14 House construction - Top view
09/02/13 business
09/02/13 Animal hospital
09/02/11 Jackfruit
09/02/10 House construction and kitchen
09/02/08 Swimming in the sea
09/02/07 Car battery replacement
09/02/05 House construction and wall painting
09/02/05 Morning walk
09/02/04 House construction and electrical work
09/02/03 Banana flower
09/02/01 Resurrection Lily
09/01/31 Return to Osamis
09/01/29 About cars
09/01/28 Receiving a visa in Cebu
09/01/24 It's peaceful.
09/01/23 House construction - Top view
09/01/23 sunrise
09/01/22 House construction - walls
09/01/21 intruder
09/01/20 House construction and foundation work
09/01/20 End of the rainy season
Fluffy Lily
09/01/19 House construction and foundation work
09/01/18 House construction and well digging
09/01/17 House construction / Temporary shed
09/01/16 Building a house
09/01/15 Osamis Blackout
09/01/10 Purchase of land in a residential area
09/01/05 rainbow
09/01/05 Osamis Elementary School
09/01/03 Land search / House search
09/01/02 A vast playground
09/01/01 New Year's Festival
09/01/01 Happy new year
Cavalier Lily's Diary If you build a house in the Philippines (2009/12/29)) This day last year...
December 298, 2008.
If you build a house in the Philippines...
This is a compilation of my experience building a house in the Philippines.

I just built a house on Mindanao Island.
We built a 250 square meter house on a 300 square meter plot of land.

Land 2.6 million pesos.
Building 2.4 million pesos
In addition, roofing material, well, water works, paint, sewage tank, etc. 1.6 million pesos

2.4 million + 1.6 million = 4 million pesos

Total: 6.6 million pesos ($6.6 million)

Land: 2.6 million pesos
Building: 2.4 million pesos
Other work includes electrical work, roofing materials, wells, plumbing, painting, and sewage tanks, totaling 1.6 million pesos.

The total is 6.6 million pesos (6.6 million).
In Japanese yen, that's approximately 14,917,600 yen (14.91 million yen).10,851,000 yen.

The construction period was approximately 5 months. I think this is probably the fastest construction period ever.
He goes to the construction site every day, where his Filipino wife acts as the site supervisor, and he goes shopping for the necessary materials every day to provide them to the mison (mason) and workers.
That was my daily routine.
To be honest, I'm exhausted. How much easier it would be if we could just outsource everything to a construction company like in Japan.
However, in this country, doing so (outsourcing everything) requires a certain level of risk and financial investment.
Incidentally, my wife studied industrial technology at university. That's probably why she was able to work as a site supervisor.

For more details, please see Lily's Diary.


Furthermore, this house was built to Japanese standards as much as possible.
If it had been built the Filipino way, it probably would have cost less than 1.5 million pesos, including the land.
Why did the building cost 4 million pesos?

1) When stacking the blocks, the rebar was so flimsy that I ended up shouting that it be made to the same standard as Japanese standards.
This photo shows a lot of rebar. If you don't specify otherwise, only one piece of rebar will be used.
 


2) Because I got angry when they started applying the concrete to the wall.
It seems that Misun and all the workers had a meeting and discussed 'In any case, let's respect the homeowner's wishes rather than focusing on cost.'.


3) We wired the electrical system to all rooms using both Philippine 230V and Japanese 100V (my wife was furious because this cost a lot of money).

The orange pipe is a flexible pipe. I later found out that flexible pipes also come in small, medium, and large sizes.
However, the electrical engineers couldn't even read a single-line diagram and never fully understood how many wires were needed. To make matters worse, they couldn't run wires through pipes that had been laid in a curved shape. They were constantly doing back-office work, such as breaking down concrete walls to run wires.


This engineer can't even wire a circuit breaker without my instructions.

In a more standard house, there are one or two circuit breakers.
They've probably never seen such complex wiring before.









4) The 230V outlets are oriented horizontally, like in the Philippines, while the 100V outlets are oriented vertically, like in Japan. I also had red "230V" stickers and green "100V" stickers made at a sticker shop and put them on all of them.


All electrical appliance plugs have stickers on them, so even children will never get them mixed up.
5) The wiring connections here are simply twisted together with pliers. As an electrician, I couldn't accept that, so I ordered ring sleeves from Japan.
6) All the taps now dispense hot water.

7) I purchased a large water heater for a Japanese-style bath.


8) Use the widest possible drain pipes and route them in a straight line.
As you can see from this, there is no foundation work. A mesh is laid on the ground and concrete is poured directly onto it.


8) The ceiling and walls were painted four times.



9) The roof is made of a special coating material that is resistant to rust.


His wife estimates that building the same house in Cebu would probably cost between 20 million and 30 million yen.
Would it cost 100 million yen to build in Manila?

Many construction methods in the Philippines are far removed from reinforced concrete (RC) construction.
First of all, there is no rebar as a foundation. There is some, but it's just very thin rebar tied together with wire.
Furthermore, the reinforcing bars used to form the columns that rise from the foundation are also thin.
Other houses didn't even bother assembling the reinforcing bars like in the picture.
Basically, think of it as simply assembling blocks and running reinforcing bars through them.
The number of reinforcing bars is just a token amount.

Now, if you entrust the procurement of these materials and process management to a master carpenter known as a "mison" (or "mason"), he will first collude with hardware shops to inflate prices and then pocket a large portion of the rebates.

Normally, the homeowner goes to the hardware shop themselves, purchases the necessary items, transports them, and delivers them to the site. On one occasion, when Mison was in Cebu for business, she personally contacted the hardware shop and requested a kickback. However, because my wife had been negotiating a lower price until the very last minute, the hardware shop contacted her, and the attempt was thwarted.

In one case I actually witnessed, a woman married to an American man lived in the US and sent money to Mison in the Philippines, entrusting him with a project. However, he stole all the materials, the project is still unfinished, she lost her money, and the land has become a ruin.

What this shows is that building a house (or apartment) requires a trustworthy person who can dedicate themselves to the project. This trustworthy person could be a relative, family member, or friend, but they need to be able to be there for the entire nearly five-month construction period. For this reason, only wealthy people can build a decent house.

The septic tank (what is called a wastewater tank in Japan) is included in the price.
On the right, they are burying the sewage manhole. It's slanted because it's caught on the foundation. They will bury it down to 5 meters from here.


These are the minimum costs involved in building a house.


However, as is common practice here, electrical wiring, plumbing, painting, and furniture are handled by different specialists, so the prices will be separate.
Window frames, sashes, and glass are also sold separately.



The plumber didn't seem to understand when I instructed him to wrap the pipes with insulation sheets.

December 24, 2009    December 31, 2009.