The roof is scheduled to arrive directly from the factory on March 24th.
Construction on the awning is progressing, and passersby are calling out to me saying "'It will become beautiful.'".
The bedroom window frame has been completed and installed.
It is entirely constructed by welding steel frames.
It looked rather rugged, so I asked Gigi if it was 'Isn't there something more we can do?', but he replied that it was 'For safety'.
This is the window frame in the living room.
Apparently, a sliding window will be installed on the inside.
After welding, the surface is polished with a grinder and then rust-preventive paint is applied.
This is the kitchen. The sink has been installed and the tiles have been laid.
A typical home has one small sink, but I convinced Gigi to let me have a double one.