There are increasing situations where real-time communication with Giga is required,
The continued slow pace of communication is frequently leading to conflicts.
The biggest problem today is whether or not to weld the reinforcing bars after tying them together with wire.
Gigi had said he would do it, of course, but by evening the rebar, which hadn't even been welded yet, was submerged in water, and there was no schedule, so I had him check it.
It seems to be 'The reinforcing steel in a single-story house is not welded, but it is still strong enough.'.
However, when asked if they had performed strength calculations, they responded with 'Why is it necessary?', asking the same question in return.
Today, January 18th, seems to be the most auspicious day for building a house in the Philippines.
The workers gathered at 8 a.m. and the work began.
Today's work involves digging the well, cutting and assembling the rebar for the foundation, and digging the hole to bury the foundation.
This is well digging.
A 6-meter pipe is erected in the ground, and a large weight is driven down onto it to bury the pipe.
A total of three pipes were driven in, and by noon, all the work was finished.
Even well drilling is done by manual.
The process involves driving a pipe into the ground and then using a water pump from an engine to remove the soil and debris, repeating this process over and over.