Cavalier Lily's Diary



昨日までのアクセス
TOP
Japanese
   
09/12/31 Japanese food in our home
09/12/29 House Construction - Compilation
09/12/24 Christmas Party
09/12/21 Christmas presents
09/12/18 Country Mall
09/12/14 To Cebu Island
09/12/13 Peaceful days
09/12/05 Christmas illuminations at Depolog
09/11/30 Evening race
09/11/25 Evening walk
09/11/19 Introducing my home
09/11/13 Tuna sashimi
09/11/11 Studying arithmetic
09/11/10 evening
09/11/08 big family
09/11/06 Kappa Ebisen
09/11/02 Farmland and corn
09/11/01 Weight measurement
09/10/29 Tigdok Animal Zoo
09/10/28 On Dad's pillow
09/10/23 Feature: Women of Cebu
09/10/23 Rabies vaccination in Cebu
09/10/15 Car air conditioning repair
09/10/13 Typhoon damage in Manila
09/10/11 Watching a movie
09/10/03 The state of farmland
09/10/02 hospitalization
09/09/25 Birthday party
09/09/21 Urethral stones again
09/09/21 Drying rice
09/09/20 Jump rope in the evening
09/09/19 Rice harvest
09/09/15 Lily is fast charging.
09/09/11 Jian Jinny is an excellent student.
09/09/09 The dancing girls
09/09/08 Going to farmland
09/09/07 A walk
09/09/06 Relaxing on the terrace
09/09/03 A beaming smile
09/08/29 terrace
09/08/23 Roroy-chan Jump
09/08/22 Visiting farmland
09/08/17 Terin's birthday
09/08/16 Roroy-chan
09/08/10 Staying home alone
09/08/09 NHK WORLD Shortwave Broadcasting
09/08/08 stroll
09/08/06 Amateur radio tower
09/08/05 To Gigi Hospital
09/08/04 Elementary school event
09/08/02 It's cold in the Philippines too...
09/07/31 Roroy-chan
09/07/25 Lily's dad's friend
09/07/19 Model
09/07/19 Amateur radio 144MHz antenna
09/07/18 Construction of a pigsty on farmland
09/07/17 A walk in the afternoon
09/07/17 Morning scenery
09/07/16 Morning walk
09/07/10 Amateur radio 50MHz antenna
09/07/13 Sleeping peacefully together
09/07/12 Dog Festival
09/07/09 Houses and pigsties on farmland
09/07/09 Study room
09/07/08 PRIUS
09/07/07 They caught a shoplifter.
09/07/07 A walk
09/07/07 kindergarten
09/07/04 Japanese cuisine
09/07/03 I love you
09/07/02 CQ CQ CQ!
09/07/02 Farmland and work sheds
09/07/02 table
09/07/01 My pride and joy: the bath
09/06/30 Carabao
09/06/25 Third hospitalization
09/06/21 I'm down with diarrhea.
09/06/15 Land development
09/06/15 New family and outlet
09/06/14 Farmland maintenance and picnics
09/06/14 Land development
09/06/13 5th Family Anniversary
09/06/11 Lily and Loroy
09/06/10 House construction and completion
09/06/08 House construction and completion party
09/06/05 Truck breaks down
09/05/31 Beautiful Queen
09/05/30 Searching for farmland
09/05/29 Amateur radio antenna
09/05/28 Playing together
09/05/28 House construction/room conditions
09/05/27 global warming
09/05/26 beach
09/05/24 The distance between Lily and Loroy
09/05/17 Roroy-chan
09/05/15 A delicate distance
09/05/13 First meeting
09/05/10 Roroy-chan
09/05/08 Hello, my name is Roroy.
09/05/07 I'm going to Cebu Island.
09/05/05 I bought a truck for business purposes.
09/05/01 House construction/room conditions
09/04/29 5th birthday
09/04/22 They are cherished.
09/04/20 Building a house and another hospital stay.
09/04/17 Rice harvest
09/04/15 The rice harvest will be here soon.
09/04/14 The roof for the house has arrived.
09/04/13 bicycle
09/04/11 run
09/04/11 Lunch with the kids
09/04/08 House construction and parking
09/04/07 Running after a long time
09/04/02 Summer vacation
09/03/27 I have a little free time
09/03/24 Gentle and heartwarming
09/03/22 rice paddy
09/03/20 Special day
09/03/18 Shopping by sidecar
09/03/18 House construction - window frames
09/03/15 A peaceful morning
09/03/11 House building - Lily also visits
09/03/09 House construction/room conditions
09/03/08 pool
09/03/07 House construction - shower room
09/03/07 Morning walk on the beach
09/03/05 House construction and electrical work
09/03/04 Riding in a sidecar
09/03/02 Going to Cagayan
09/02/28 Street corner scenery
09/02/28 House construction - Top view
09/02/27 Elementary school event
09/02/25 House construction - roof and ceiling
09/02/25 I'm feeling better now.
09/02/24 House construction and roof framing
09/02/24 House building and farmland search
09/02/23 Lily has fully recovered.
09/02/23 House construction - roof framework
09/02/20 Something is wrong with Lily's eyes.
09/02/19 House construction and water/sewage systems
09/02/18 Lily's dad is hospitalized.
09/02/15 drive
09/02/14 House construction - Top view
09/02/13 business
09/02/13 Animal hospital
09/02/11 Jackfruit
09/02/10 House construction and kitchen
09/02/08 Swimming in the sea
09/02/07 Car battery replacement
09/02/05 House construction and wall painting
09/02/05 Morning walk
09/02/04 House construction and electrical work
09/02/03 Banana flower
09/02/01 Resurrection Lily
09/01/31 Return to Osamis
09/01/29 About cars
09/01/28 Receiving a visa in Cebu
09/01/24 It's peaceful.
09/01/23 House construction - Top view
09/01/23 sunrise
09/01/22 House construction - walls
09/01/21 intruder
09/01/20 House construction and foundation work
09/01/20 End of the rainy season
Fluffy Lily
09/01/19 House construction and foundation work
09/01/18 House construction and well digging
09/01/17 House construction / Temporary shed
09/01/16 Building a house
09/01/15 Osamis Blackout
09/01/10 Purchase of land in a residential area
09/01/05 rainbow
09/01/05 Osamis Elementary School
09/01/03 Land search / House search
09/01/02 A vast playground
09/01/01 New Year's Festival
09/01/01 Happy new year
Cavalier Lily's Diary: Building a House - Lily's Visit.(2009/03/11)
Cavalier, Lily
This day last year...
March 11, 2008.
I had her sit by the living room window and took one photo.
Once the house is completed, you will no longer be able to access the road directly via a gate.
The garden is planned to be a space where Lily can roam freely.
4:30.
It's almost time for elementary school to end.
Lily is left alone in Subrabas's parking lot.
Raisa came home from school, so I asked her to look after Lily.
Electrician.
Gigi brought another person over, and the two of them started wiring.
The first electrician wired it with stranded wire,
I had them redo the wiring using the manufacturer's specified single-core wire (solid wire).

However, since I used the thinnest flexible tubing available, there are many places where the wiring won't fit.
As you can see, there are also scenes where concrete is chipped away and new pipes are installed.
However, since there are no power tools like in Japan, everything has to be done by hand, so it takes a whole day to do it in one place.

These are the power outlets in the computer room. There are five of them in this one room.
Today, I also had the wiring done for the three-way switch (the kind that controls the up and down of stairs).

However, he seems to be pondering something while holding the Switch.
I'm aware of the existence of 2-way switches, but it seems this is my first time actually wiring one.
After I drew the diagram and demonstrated using the actual switches, the wiring was completed very quickly.

The person holding the Switch is Gigi's cousin, JunJun (21 years old), a handsome guy.
Could someone introduce him to a girlfriend? (lol)
I'm also helping with the wiring work.
At the end of the workday, we chat with the craftsmen and exchange information like this.
Site supervisor (Mison) and plumber

I really like this plumber because he understands 10 things when I explain just one.
This character somehow reminds me of someone you might find working for a Japanese plumbing company.
March 9, 2009    March 15, 2009.