The blueprints and exterior drawings are finally ready.
The layout diagram cannot be made public for security reasons, but the exterior will look something like this.
Foundation work has been progressing rapidly even before the layout drawings were completed.
There are already discrepancies between the drawings that incorporated our requests and the current ones, so it looks like we'll need to make some revisions.
Bringing in the concrete blocks.
Reinforcing bars, gravel, sand, and blocks are being brought in.
By the way, the sandbags in the sandy area were my suggestion to prevent the road from getting dirty.
I try to sweep the road with a broom in the evenings, and the husband of the house across the street is very kind and helpful ('never mind').
This is the delivery of cement.
They are being carried into a temporary shed to protect them from the rain.
The blocks that will form the walls are being stacked from the foundation up.
The bedrooms are located at the back and in the front left, followed by a computer room, making a total of three rooms, before the kitchen.
On the right side are the 5m x 6m main bedroom and living room.
The area where Gigi is standing will have two toilets and a Japanese-style bathroom.
The area where Gigi is standing is the door leading from the living room to the carport.
The bottom of the door is approximately 40 centimeters from the ground.