The second pig barn on the left is almost complete.
This is where newborn piglets are raised from two to four months old.
The building with the partially red roof visible in the distance is the caretaker's hut.
Construction has begun on the first pig barn, which is located in the foreground.
However, construction has been delayed due to continuous rain.
You can see that water has accumulated in the foreground due to the heavy rain.
The construction is only about halfway complete.
Furthermore, the pigsty we built in June will have to be demolished, but it's built quite sturdily, so it's going to be a very difficult job.
The flooring work in the back left is still stalled due to the continuous rain.