This is the completed pigsty.
To save on cement, the exterior sides and back of the walls were not coated with cement.
Gigi made flowerbeds around the pigsty.
I'm talking to the master carpenter about something related to the sewage tank.
I'm also in a meeting with the master carpenter.
The first tank (on the right) has been excavated, and now we will begin assembling the blocks.
The blocks are mostly assembled now.
A drainage pipe was connected from the pigsty.
Assembly of the top lid of the first tank.
Excavation of the second tank.
The excavation is finished.
Now we'll assemble the blocks.