The additional Nipa leaves are almost in place.
We're still a few pieces short, so we're placing an additional order.
It's strange how the small shed suddenly looks so big once the roof is in place.
As I mentioned the other day, it's apparently about the same size as an average house, which has surprised visitors.
This is the front.
Large stones were lined up in the central aisle.
We'll cover it with soil, lay down gravel, tamp it down, and then pour in concrete.
The pig enclosures on both sides are almost finished.
We will deepen Septic Tank No. 1 even further.
It seems they'll eventually dig down to about 2 meters.